Uploaded image for project: 'Deep Backlog'
  1. Deep Backlog
  2. DB-194

Y-axis "Max" value may revert to default when the slider is moved

    Details

    • Type: Bug
    • Status: Open (View Workflow)
    • Priority: Major
    • Resolution: Unresolved
    • Labels:
      None

      Description

      In the Graphs tab there are textboxes that allow a user to enter in whatever value they want for the "Min" and "Max" y-axis values.

      When a graph is created there is a default "Min" and "Max" created that can be seen in these textboxes. The "Min" default is 0 but the "Max" default is dependent upon the specific graph track.

      If a user attempts to increase the "Max" value (from say 80 to 100) the graph track updates accordingly.

      But then, if a user adjust either the left or right edge of the y-axis slider then the "Max" value reverts to its default. This can cause frustration for a user.

      Try this activity to illustrate the issue:

      *Create a graph track and attempt to lower the height of the graph without decreasing the track height.

      You will find that this can't be done without inputting a "Max" value that is greater than the default. Attempting to fine tune this with the slider will cause the "Max" value to revert to its default, so the only way to get it just right is to keep entering a "Max" value over and over until you get it just right.

        Attachments

          Activity

          No work has yet been logged on this issue.

            People

            • Assignee:
              ann.loraine Ann Loraine
              Reporter:
              mason Mason Meyer (Inactive)
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated: