Uploaded image for project: 'IGB'
  1. IGB
  2. IGBF-3622

Create a Draft 1 Pipeline Document

    Details

    • Type: Task
    • Status: Closed (View Workflow)
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Labels:
      None

      Description

      Now that we have used the pipeline multiple times successfully, it is time to write a paper about every step in detail. This is to ensure that methods are documented and not forgotten. The pipeline would include submitting data to SRA, using the data from SRA, running the data through nextflow nfcore, sanity check the data with original data, submit data to IGB quick load.

        Attachments

          Issue Links

            Activity

            No work has yet been logged on this issue.

              People

              • Assignee:
                Mdavis4290 Molly Davis
                Reporter:
                Mdavis4290 Molly Davis
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: