Uploaded image for project: 'IGB'
  1. IGB
  2. IGBF-835

Sync Preference changes between multiple instances of ProtAnnot

    Details

    • Type: Bug
    • Status: To-Do (View Workflow)
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Labels:
      None
    • Story Points:
      1

      Description

      While testing IGBF-815 I noticed that if I had two instances of ProtAnnot running within IGB and changed the residue color through one of the ProtAnnot windows then the residue color would update for both of the instances of ProtAnnot (once the other ProtAnnot window was clicked on). This behavior is acceptable.

      However, when I went back into the ProtAnnot preferences through the instance that I did not initially change the color in then I would notice that the Color Preference widget was out of sync with the residue color seen in the coordinates track (see screenshot). This should be fixed before the next release.

        Attachments

          Activity

          mason Mason Meyer (Inactive) created issue -
          mason Mason Meyer (Inactive) made changes -
          Field Original Value New Value
          Epic Link IGBF-439 [ 15497 ]
          mason Mason Meyer (Inactive) made changes -
          Rank Ranked higher
          jeckstein John Eckstein (Inactive) made changes -
          Status Open [ 1 ] In Progress [ 3 ]
          jeckstein John Eckstein (Inactive) made changes -
          Status In Progress [ 3 ] Pull Request Submitted [ 10101 ]
          jeckstein John Eckstein (Inactive) made changes -
          Status Pull Request Submitted [ 10101 ] Needs Testing [ 10002 ]
          jeckstein John Eckstein (Inactive) made changes -
          Assignee John Eckstein [ jeckstein ] Mason Meyer [ mason ]
          mason Mason Meyer (Inactive) made changes -
          Status Needs Testing [ 10002 ] Testing In Progress [ 10003 ]
          mason Mason Meyer (Inactive) made changes -
          Sprint Sprint 24 [ 31 ] Backlog Grooming Meeting [ 32 ]
          dcnorris David Norris (Inactive) made changes -
          Sprint Backlog Grooming Meeting [ 32 ] Sprint 25 [ 34 ]
          dcnorris David Norris (Inactive) made changes -
          Rank Ranked lower
          dcnorris David Norris (Inactive) made changes -
          Rank Ranked higher
          dcnorris David Norris (Inactive) made changes -
          Rank Ranked lower
          dcnorris David Norris (Inactive) made changes -
          Rank Ranked lower
          dcnorris David Norris (Inactive) made changes -
          Rank Ranked higher
          dcnorris David Norris (Inactive) made changes -
          Sprint Backlog Grooming Meeting [ 34 ] Backlog Grooming Meeting 2 [ 35 ]
          mason Mason Meyer (Inactive) made changes -
          Sprint Backlog Grooming Meeting 2 [ 35 ]
          mason Mason Meyer (Inactive) made changes -
          Rank Ranked higher
          mason Mason Meyer (Inactive) made changes -
          Status Testing In Progress [ 10003 ] Open [ 1 ]
          ann.loraine Ann Loraine made changes -
          Story Points 1
          ann.loraine Ann Loraine made changes -
          Epic Link IGBF-439 [ 15497 ]
          ann.loraine Ann Loraine made changes -
          Workflow Loraine Lab Workflow [ 16239 ] Fall 2019 Workflow Update [ 18780 ]
          ann.loraine Ann Loraine made changes -
          Workflow Fall 2019 Workflow Update [ 18780 ] Revised Fall 2019 Workflow Update [ 20902 ]
          Status Open [ 1 ] To-Do [ 10305 ]

            People

            • Assignee:
              mason Mason Meyer (Inactive)
              Reporter:
              mason Mason Meyer (Inactive)
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated: