Details
-
Type:
Sub-task
-
Status: Closed (View Workflow)
-
Priority:
Major
-
Resolution: Done
-
Affects Version/s: None
-
Fix Version/s: 9.1.0 Major Release
-
Labels:
-
Story Points:1.5
-
Sprint:Winter 2018 Sprint 3, Spring 2019 Sprint 1
Description
This subtask is to prepare text that needs to be shown in pop-up window:
1. Read igbDefaultPref.json, which contains details about each Quickload site link (There is igbPrefrence.java class object which already reads from json file, please check if same object can be used)
2. Add logic on info button click event to append correct respective Quickload details in pop-up window
3. When user click on Copy option, text should be in Copy buffer, which user can use to paste in his records for reference.
Attachments
Issue Links
Activity
Field | Original Value | New Value |
---|---|---|
Description |
This subtask is to prepare text that needs to be shown in pop-up window:
1. Read igbDefaultPref.json, which contains details about each Quickload site details.(There is igbPrefrence.java class object which already reads from json file, please check if same object can be used) 2. Add logic on info button click event to append correct respective quickload details in pop-up window 3. When user click on Copy option, text should be in Copy buffer, which user can use to paste in his records for reference. |
This subtask is to prepare text that needs to be shown in pop-up window:
1. Read igbDefaultPref.json, which contains details about each Quickload site link (There is igbPrefrence.java class object which already reads from json file, please check if same object can be used) 2. Add logic on info button click event to append correct respective Quickload details in pop-up window 3. When user click on Copy option, text should be in Copy buffer, which user can use to paste in his records for reference. |
Assignee | Srishtee Marotkar [ srishteem ] |
Fix Version/s | 9.1.0 Major Release [ 10601 ] | |
Story Points | 1.5 | |
Labels | intermediate |
Rank | Ranked higher |
Status | Open [ 1 ] | In Progress [ 3 ] |
Status | In Progress [ 3 ] | Needs 1st Level Review [ 10005 ] |
Rank | Ranked higher |
Status | Needs 1st Level Review [ 10005 ] | Ready for Pull Request [ 10304 ] |
Status | Ready for Pull Request [ 10304 ] | Pull Request Submitted [ 10101 ] |
Resolution | Done [ 10000 ] | |
Status | Pull Request Submitted [ 10101 ] | Closed [ 6 ] |
Workflow | Loraine Lab Workflow [ 18224 ] | Fall 2019 Workflow Update [ 20003 ] |
Workflow | Fall 2019 Workflow Update [ 20003 ] | Revised Fall 2019 Workflow Update [ 22130 ] |