Details

    • Type: Task
    • Status: Closed (View Workflow)
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Labels:
      None
    • Story Points:
      2
    • Sprint:
      Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun, Summer 1: 8 Jun - 19 Jun, Summer 4: 14 Jul - 28 Jul

      Description

      Situation: As we have completed all of the current in-scope functionality for BioViz Connect, once the final bug issues are completed we will have a code freeze in order to test that all of the various features in BioViz Connect are working correctly.

      Testing Tasks:

      1) Navigate through files folders in home/shared/community.

      2) Check that back/forward/refresh browser buttons are working while navigating.

      3) Check that column sorting (Name, Last Modified, Size) is working for files/folders in home/shared/community.

      4) Check that Manage Link is working for files/folders in home/shared/community.

      4*) Check that Create/Remove public link button is working.

      5) Check that MetaData is working for files/folders in home/shared/community.

      5*) Check that Genome Version, IGB Track Color, IGB Track Name are all saved and sent to IGB when user clicks View in IGB.

      6) Make sure View in IGB button visible on correct files in home/shared/community.

      7) Run analyses for IGB Bedtools Genome Coverage and IGB DeepTools BamCoverage on files in home/shared/community.

      7*) Run analyses for IGB Dreme Motif Finder in home (48v37_summits.fasta).

      8) Check that analyses status and correct name are present in the analyses log.

      9) Check that analyses complete successfully by viewing output in IGB.

      10) Check that all buttons, links, tooltips, toast notifications work and appear correctly.

      11) Try to break things.

        Attachments

          Issue Links

            Activity

            nfreese Nowlan Freese created issue -
            nfreese Nowlan Freese made changes -
            Field Original Value New Value
            Epic Link IGBF-1482 [ 17568 ]
            nfreese Nowlan Freese made changes -
            Link This issue relates to IGBF-2297 [ IGBF-2297 ]
            nfreese Nowlan Freese made changes -
            Link This issue relates to IGBF-2298 [ IGBF-2298 ]
            nfreese Nowlan Freese made changes -
            Description Situation: As we have completed all of the current in-scope functionality for BioViz Connect, once IGBF-2290 and IGBF-2292 are completed we will have a code freeze in order to test that all of the various features in BioViz Connect are working correctly.

            Testing Tasks:

            1) Navigate through files folders in home/shared/community.

            2) Check that back/forward/refresh browser buttons are working while navigating.

            3) Check that column sorting (Name, Last Modified, Size) is working for files/folders in home/shared/community.

            4) Check that Manage Link is working for files/folders in home/shared/community.

            4*) Check that Create/Remove public link button is working.

            5) Check that MetaData is working for files/folders in home/shared/community.

            5*) Check that Genome Version, IGB Track Color, IGB Track Name are all saved and sent to IGB when user clicks View in IGB.

            6) Make sure View in IGB button visible on correct files in home/shared/community.

            7) Run analyses for IGB Bedtools Genome Coverage and IGB DeepTools BamCoverage on files in home/shared/community.

            7*) Run analyses for IGB Dreme Motif Finder in home (48v37_summits.fasta).

            8) Check that analyses status and correct name are present in the analyses log.

            9) Check that analyses complete successfully by viewing output in IGB.

            10) Check that all buttons, links, tooltips, toast notifications work and appear correctly.

            11) Try to break things.
            Situation: As we have completed all of the current in-scope functionality for BioViz Connect, once the final bug issues are completed we will have a code freeze in order to test that all of the various features in BioViz Connect are working correctly.

            Testing Tasks:

            1) Navigate through files folders in home/shared/community.

            2) Check that back/forward/refresh browser buttons are working while navigating.

            3) Check that column sorting (Name, Last Modified, Size) is working for files/folders in home/shared/community.

            4) Check that Manage Link is working for files/folders in home/shared/community.

            4*) Check that Create/Remove public link button is working.

            5) Check that MetaData is working for files/folders in home/shared/community.

            5*) Check that Genome Version, IGB Track Color, IGB Track Name are all saved and sent to IGB when user clicks View in IGB.

            6) Make sure View in IGB button visible on correct files in home/shared/community.

            7) Run analyses for IGB Bedtools Genome Coverage and IGB DeepTools BamCoverage on files in home/shared/community.

            7*) Run analyses for IGB Dreme Motif Finder in home (48v37_summits.fasta).

            8) Check that analyses status and correct name are present in the analyses log.

            9) Check that analyses complete successfully by viewing output in IGB.

            10) Check that all buttons, links, tooltips, toast notifications work and appear correctly.

            11) Try to break things.
            nfreese Nowlan Freese made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar [ 90 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10 [ 90, 91 ]
            nfreese Nowlan Freese made changes -
            Rank Ranked higher
            ann.loraine Ann Loraine made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10 [ 90, 91 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr [ 90, 91, 92 ]
            ann.loraine Ann Loraine made changes -
            Rank Ranked higher
            ann.loraine Ann Loraine made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr [ 90, 91, 92 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May [ 90, 91, 92, 93 ]
            ann.loraine Ann Loraine made changes -
            Rank Ranked higher
            Hide
            nfreese Nowlan Freese added a comment - - edited

            In MetaData right panel, put a line break in the comments section (between two pieces of text, for example), and see if it saves correctly. I'm getting some weird results.
            -Created IGBF-2476 to address the metadata issue.

            Also double-check that if you have the metadata panel open, click on a separate file, that any changes to the metadata get saved correctly.
            -Not worried about this issue as if a user clicks outside of the right-panel they may be trying to cancel their changes.

            Show
            nfreese Nowlan Freese added a comment - - edited In MetaData right panel, put a line break in the comments section (between two pieces of text, for example), and see if it saves correctly. I'm getting some weird results. -Created IGBF-2476 to address the metadata issue. Also double-check that if you have the metadata panel open, click on a separate file, that any changes to the metadata get saved correctly. -Not worried about this issue as if a user clicks outside of the right-panel they may be trying to cancel their changes.
            Hide
            nfreese Nowlan Freese added a comment - - edited

            Bug where I'm in Community folder, but BioViz Connect thinks I'm in the Home directory.

            I was in the Community folder [ here | https://connect.bioviz.org/base/#/iplant/home/shared/BioViz/rnaseq/A_thaliana_Jun_2009/SRP220157/reads], but was then logged out after 16 hours. I signed out, then signed back in. Then used the back button on my browser to return [ here | https://connect.bioviz.org/base/#/iplant/home/shared/BioViz/rnaseq/A_thaliana_Jun_2009/SRP220157/reads]. Now BioViz Connect thinks I'm in the home directory. This breaks the breadcrumbs. (attached screenshot)
            -This issue should be fixed by the changes made to automatic logout after 16 hours in IGBF-2299.

            Show
            nfreese Nowlan Freese added a comment - - edited Bug where I'm in Community folder, but BioViz Connect thinks I'm in the Home directory. I was in the Community folder [ here | https://connect.bioviz.org/base/#/iplant/home/shared/BioViz/rnaseq/A_thaliana_Jun_2009/SRP220157/reads ], but was then logged out after 16 hours. I signed out, then signed back in. Then used the back button on my browser to return [ here | https://connect.bioviz.org/base/#/iplant/home/shared/BioViz/rnaseq/A_thaliana_Jun_2009/SRP220157/reads ]. Now BioViz Connect thinks I'm in the home directory. This breaks the breadcrumbs. (attached screenshot) -This issue should be fixed by the changes made to automatic logout after 16 hours in IGBF-2299 .
            nfreese Nowlan Freese made changes -
            ann.loraine Ann Loraine made changes -
            Epic Link IGBF-1482 [ 17568 ] IGBF-2376 [ 18533 ]
            ann.loraine Ann Loraine made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May [ 90, 91, 92, 93 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May [ 90, 91, 92, 93, 94 ]
            ann.loraine Ann Loraine made changes -
            Rank Ranked higher
            ann.loraine Ann Loraine made changes -
            Rank Ranked higher
            ann.loraine Ann Loraine made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May [ 90, 91, 92, 93, 94 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun [ 90, 91, 92, 93, 94, 95 ]
            ann.loraine Ann Loraine made changes -
            Rank Ranked higher
            ann.loraine Ann Loraine made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun [ 90, 91, 92, 93, 94, 95 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun, Summer 1: 8 Jun - 19 Jun [ 90, 91, 92, 93, 94, 95, 96 ]
            ann.loraine Ann Loraine made changes -
            Rank Ranked higher
            ann.loraine Ann Loraine made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun, Summer 1: 8 Jun - 19 Jun [ 90, 91, 92, 93, 94, 95, 96 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun, Summer 1: 8 Jun - 19 Jun, Summer 2: 22 Jun - 3 July [ 90, 91, 92, 93, 94, 95, 96, 97 ]
            ann.loraine Ann Loraine made changes -
            Rank Ranked higher
            nfreese Nowlan Freese made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun, Summer 1: 8 Jun - 19 Jun, Summer 2: 22 Jun - 3 Jul [ 90, 91, 92, 93, 94, 95, 96, 97 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun, Summer 1: 8 Jun - 19 Jun, Summer 3: 3 Jul - 14 Jul [ 90, 91, 92, 93, 94, 95, 96, 98 ]
            ann.loraine Ann Loraine made changes -
            Assignee Nowlan Freese [ nfreese ]
            ann.loraine Ann Loraine made changes -
            Sprint Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun, Summer 1: 8 Jun - 19 Jun, Summer 3: 3 Jul - 14 Jul [ 90, 91, 92, 93, 94, 95, 96, 98 ] Spring 5 : 16 Mar to 27 Mar, Spring 6 : 30 Mar to Apr 10, Spring 7 : 13 Apr to 24 Apr, Spring 8 : 24 Apr to 8 May, Spring 8 : 11 May to 25 May, Spring 9 : 25 May to 8 Jun, Summer 1: 8 Jun - 19 Jun, Summer 4: 14 Jul - 28 Jul [ 90, 91, 92, 93, 94, 95, 96, 99 ]
            ann.loraine Ann Loraine made changes -
            Rank Ranked lower
            Hide
            ann.loraine Ann Loraine added a comment -

            Nowlan Freese - is the issue mentioned in the previous comment still a problem? If not, could we close this ticket or maybe migrate the testing protocol to another location in our infrastructure? (Perhaps a Google Doc dedicated to testing BioViz Connect?)

            Show
            ann.loraine Ann Loraine added a comment - Nowlan Freese - is the issue mentioned in the previous comment still a problem? If not, could we close this ticket or maybe migrate the testing protocol to another location in our infrastructure? (Perhaps a Google Doc dedicated to testing BioViz Connect?)
            nfreese Nowlan Freese made changes -
            Assignee Nowlan Freese [ nfreese ]
            nfreese Nowlan Freese made changes -
            Status To-Do [ 10305 ] In Progress [ 3 ]
            nfreese Nowlan Freese made changes -
            Status In Progress [ 3 ] Needs 1st Level Review [ 10005 ]
            nfreese Nowlan Freese made changes -
            Status Needs 1st Level Review [ 10005 ] First Level Review in Progress [ 10301 ]
            nfreese Nowlan Freese made changes -
            Status First Level Review in Progress [ 10301 ] Ready for Pull Request [ 10304 ]
            nfreese Nowlan Freese made changes -
            Status Ready for Pull Request [ 10304 ] Pull Request Submitted [ 10101 ]
            nfreese Nowlan Freese made changes -
            Status Pull Request Submitted [ 10101 ] Reviewing Pull Request [ 10303 ]
            nfreese Nowlan Freese made changes -
            Status Reviewing Pull Request [ 10303 ] Merged Needs Testing [ 10002 ]
            nfreese Nowlan Freese made changes -
            Status Merged Needs Testing [ 10002 ] Post-merge Testing In Progress [ 10003 ]
            nfreese Nowlan Freese made changes -
            Resolution Done [ 10000 ]
            Status Post-merge Testing In Progress [ 10003 ] Closed [ 6 ]

              People

              • Assignee:
                nfreese Nowlan Freese
                Reporter:
                nfreese Nowlan Freese
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: