Details

    • Type: Task
    • Status: Closed (View Workflow)
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Labels:
      None
    • Story Points:
      10
    • Sprint:
      Fall 3 2022 Sep 26, Fall 4 2022 Oct 10, Fall 5 2022 Oct 24

      Description

      Subsystems must be tested prior to releasing IGB 9.1.10

      Go to the link below and complete all testing:

      https://wiki.bioviz.org/confluence/display/ITD/Subsystems

        Attachments

          Activity

          Hide
          rweidenh Logan Weidenhammer (Inactive) added a comment -

          JIRA Issues were created for previously mentioned bugs.

          I completed testing on Thursday through the Navigation Subsystem. The issue IGBF-3199 regarding local quickloads needs resolved before testing on Subsystems Local Quickload and Quickload Saver can be completed.

          Show
          rweidenh Logan Weidenhammer (Inactive) added a comment - JIRA Issues were created for previously mentioned bugs. I completed testing on Thursday through the Navigation Subsystem. The issue IGBF-3199 regarding local quickloads needs resolved before testing on Subsystems Local Quickload and Quickload Saver can be completed.
          Hide
          rweidenh Logan Weidenhammer (Inactive) added a comment - - edited

          All of the Subsystems have been tested except for the sections reliant on IGBF-3199. That's next on my To-do.

          After that I will do a more thorough investigation of these questions:

          Protannot
          "Verify that the information link directs to the appropriate "About InterPro" page"-404 page not found. redirects to correct page http://www.ebi.ac.uk/interpro/about/interpro/ 
          Search"Select "DMD" from the Quick-search drop-down to navigate to"navigates to "GSDMD" not DMD.
          -I believe this is a previous issue. need to search JIRA.

          Soft-Clipping: is good to go.

          Synonyms: good.
          local quickload section still needs testing.

          Tabbed Panels: good.

          Toolbar: good.

          Track Operators - Annotation Tracks
          -links to user guide pages are missing 'confluence' domain word in the URL.
          -unsure how to test "Find someplace where the matching Find Junctions operation using value 5 and value 10 have different scores. Identify the read(s) that matches that junction, and where where one side of the read is between 5 and 10 bases".
          see screenshot

          -need to review user guide pages.

          Track Operations -Graph Tracks
          -need to review user guide pages
          -trouble with Single Track Operations part 3, images don't match. see screenshot.

          Track View: good.

          I will fill in the appropriate checkboxes on Monday.

          *all completed*

          Show
          rweidenh Logan Weidenhammer (Inactive) added a comment - - edited All of the Subsystems have been tested except for the sections reliant on IGBF-3199 . That's next on my To-do. After that I will do a more thorough investigation of these questions: Protannot "Verify that the information link directs to the appropriate "About InterPro" page"-404 page not found. redirects to correct page  http://www.ebi.ac.uk/interpro/about/interpro/   Search"Select "DMD" from the Quick-search drop-down to navigate to"navigates to "GSDMD" not DMD. -I believe this is a previous issue. need to search JIRA. Soft-Clipping: is good to go. Synonyms: good. local quickload section still needs testing. Tabbed Panels: good. Toolbar: good. Track Operators - Annotation Tracks -links to user guide pages are missing 'confluence' domain word in the URL. -unsure how to test "Find someplace where the matching Find Junctions operation using value 5 and value 10 have different scores. Identify the read(s) that matches that junction, and where where one side of the read is between 5 and 10 bases". see screenshot -need to review user guide pages. Track Operations -Graph Tracks -need to review user guide pages -trouble with Single Track Operations part 3, images don't match. see screenshot. Track View: good. I will fill in the appropriate checkboxes on Monday. * all completed *
          Hide
          rweidenh Logan Weidenhammer (Inactive) added a comment -

          Windows and Mac testing for 9.1.10 is complete. Next is Linux.

          Show
          rweidenh Logan Weidenhammer (Inactive) added a comment - Windows and Mac testing for 9.1.10 is complete. Next is Linux.
          Hide
          rweidenh Logan Weidenhammer (Inactive) added a comment -

          Linux Subsystems testing is now complete.
          Next we will focus on finalizing changes for IGBF-3208 and IGBF-3196 and retest saving files and secure data sources on the three operating systems.

          Show
          rweidenh Logan Weidenhammer (Inactive) added a comment - Linux Subsystems testing is now complete. Next we will focus on finalizing changes for IGBF-3208 and IGBF-3196 and retest saving files and secure data sources on the three operating systems.
          Hide
          nfreese Nowlan Freese added a comment -

          Testing complete. Closing ticket, ready for release.

          Show
          nfreese Nowlan Freese added a comment - Testing complete. Closing ticket, ready for release.

            People

            • Assignee:
              rweidenh Logan Weidenhammer (Inactive)
              Reporter:
              nfreese Nowlan Freese
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: